一品楼全国论坛闲聊51一品茶楼论坛 ,一楼一凤信息平台,长沙后花园419论坛上海龙凤水磨论坛,51一品茶楼论坛

Yiwu shuangfeng Waste Incineration power Co., Ltd. Project

Construction time:2005年 Location:yiwu zhengjiang province
Construction scale of the project is two 65t/h+two 40t/h circulating fluidized bed garbage incinerators and two 12000kw steam bleeding and condensing steam turbine generator units, which is private station project of the enterprise, with daily garbage disposal capacity of 1200t. It was completed in November 2005.

Related news:
Last one:
Next article: